The Physical Plant is responsible for maintenance, modification, and new construction for Western Illinois University, WIU Quad Cities Campuses, and other remote WIU facilities. These responsibilities include buildings, grounds, support facilities, and utility infrastructure. Operations and Maintenance units within Physical Plant include Mechanical Maintenance, Building Maintenance, Building Services, Grounds Maintenance, and Heating Plant. Physical Plant Facilities Planning and Construction provides project management for major capital projects as well as planning, design, and construction management for minor projects. Physical Plant administration provides management accounting services, work order control, billing support, warehousing and central receiving, data management, and other customer services.
Physical Plant maintenance and operations budgets received by the State provide for basic upkeep and periodic replacement of minor campus assets. Capital Renewal budgets are provided by the State for the replacement of major capital assets such as heating plant equipment, steam and water distribution piping on campus, electrical and fiber-optic distribution infrastructure, roofing, chillers, elevators, etc.
Major capital funding is requested from the State by the University for large-scale building renovations and for new building construction. The University does not receive a fixed major capital budget for each year and may not always receive major capital funding. The backlog of unfunded capital renewal projects is a significant national problem among public universities and is frequently referred to as deferred maintenance. Because of the growing deferred maintenance and deferred capital renewal liability, the following priorities are generally employed as a guideline for expending appropriated capital renewal as well as available maintenance and operational funding received from the State.
Priority I Safety & Health Issues
Priority II Environmental and Mandated Code Compliance Issues
Priority III Utility Infrastructure affecting Multiple Building Installations
Priority IV Issues affecting Revenue Loss to the University
Priority V Educational Functions
Priority VI Building Comfort and Energy Management Systems
Priority VII Non-Educational, Issues affecting Appearance of Building and Grounds
Work requested and paid for by an academic or other department is known as a "charge-back" project. Charge-back projects are managed by Physical Plant and may be accomplished with in-house Physical Plant personnel or contractors. Many factors, including Physical Plant work schedules, seasonal issues, project scale and cost, special skill requirements, and urgency of need are used by Physical Plant to determine labor strategies for accomplishing requested work. The Physical Plant attempts to execute all projects within desired schedules as cost effectively as possible. All craft and trades labor employed by the University or a contractor must be paid the current prevailing rate. Physical Plant does incorporate an overhead charge on its charge-back work, does not profit from the overhead charge, but uses the funds to equip charge-back personnel with tools, equipment, and vehicle use.
Departments that wish to request charge-back projects should request a cost estimate by completing a Service Request . To initiate a project the department should e-mail its account name and number to the project estimator and the Business Manager of the Physical Plant.
Estimates represent the Physical Plant's best approximation of the total cost to complete a requested project. Estimates are prepared by professional staff who employ recognized industry standards and comparable project cost experiences in their estimates. Because departments pay actual project costs only, Physical Plant will not "negotiate-down" its cost estimates. Renovation involves numerous unknowns. Therefore, estimates include contingencies of up to 20% of the estimated project cost. Owing to the high demand for Plant project services, cost estimates under $5,000 will not include a multiple detailed line item break of specific costs.
Institutional renovation involves rigid safety and environmental code compliance as well as accessibility for the disabled. Accordingly, University projects may cost up to three times that of light commercial or residential construction. Because of age and functional changes, many campus buildings no longer support capacity increases of electrical, plumbing, and HVAC systems necessitated by a project. As Physical Plant does not receive funding to defray these legitimate project costs, they must be borne by the requesting department.
Projects constructed during two different fiscal years may be paid with funds from two fiscal years. However, all work accomplished during a specific year must be paid for using funds from that period. To finalize project initiation, the Dean of the requesting department certifies that its department will pay all related project expenses as billed by Physical Plant. Short duration projects will be billed upon completion, while long duration projects will be billed to the departments each month. End-of-fiscal-year bills will occur in the final month of that period for all active projects.
The Physical Plant provides the labor necessary to move furniture and any other items requiring a truck and moving equipment. The unit planning the move should send a Service Request form to the Physical Plant, indicating the building and room number of the present location and the location to which the items are to be moved. Attach a list of all items to be moved.
The Service Request form must be approved by the department chairperson and building representative.
Prior to a move, tag all items indicating the building and room number of the new location. Make a small sketch of the new location, indicating the exact location of all items to be moved.
Before the day of the move, all loose materials must be packed and boxed, desks cleaned out, shelves cleaned off, and files emptied (unless drawers are removable).
Boxes of printed matter, paper goods, etc., must always be packed securely. In all cases, this material must be large enough to justify the use of a truck and the special service crew. All smaller items must be moved by the department.
A representative of the department should be on hand during the move.
The Physical Plant is not permitted nor qualified to move delicate or sensitive equipment or extremely heavy items. Manufacturers, and in some cases service contractors, may need to be consulted before these items can be moved.
Any move involving items with Western Illinois University tag numbers must first be approved by Property Control.
Service Request forms must be received seven days in advance for small moves and 15 days in advance for large moves.
All outgoing freight is shipped through the Central Receiving Station of the Physical Plant.
Phone Central Receiving to have freight picked up for shipment. A Service Request form must be available when pickup is made. This request should include the amount of insurance and contents (when required), complete address, and account number to be charged. All pickups must be addressed and ready for shipment.
Obtain approval for payment from the fiscal agent prior to shipment. Failure to do so may result in the charges being billed to the individual requesting the shipment. The Service Request form will serve as the billing to your account.
Normally shipments are made via United Parcel Service or commercial truck. Central Receiving does not handle Parcel Post. United Parcel Service has a 150 pound weight limit and a 108 inch length plus girth limit. Anything larger is shipped by commercial truck.
Pickups made before 10:00 a.m. will be shipped the same day. To maintain this service, Central Receiving should be notified the afternoon before or no later than 9:00 a.m. the day of the scheduled pickup. Any pickup after 10:00 a.m. will be shipped the next working day. When special catering is required, an additional day is needed.
Each incoming shipment should be marked with the Purchase Order number or name of the person to whom delivery is to be made. Central Receiving then identifies the shipment by comparing it to their copy of the Purchase Order. The Purchasing Office sends Central Receiving a copy of each order they expect to go through Central Receiving. Other departments ordering materials to go through Central Receiving should send copies of their orders to Central Receiving. If the materials cannot be identified by order number or name, they will be refused.
The ordering department should, as soon as practical, unpack and inspect all shipments. If there is a possibility of concealed damage, packing containers and packing material should be saved until a claim adjuster arrives. As soon as concealed damage is found, contact Central Receiving.
Collect freight bills are sent to the Purchasing Office or the department issuing the order.
C.O.D. shipments will not be accepted unless prior arrangements have been made with Central Receiving.
Any information regarding the size of a truck load or time of arrival will expedite delivery. Arrangements for special handling equipment must be made in advance.
Groups external to Western Illinois University may schedule special events by making arrangements with the University Conference Coordinator or the Office of Conferences and Event Services. If such events will require Physical Plant services, a Service Request form must be forwarded at least one month in advance of the event. Physical Plant will charge-back to the group hosting the event all overtime or additional staff charges for janitorial, moving crew, electricians, carpenters, engineers, etc., and any related material charges incurred in conjunction with the event.
Air conditioning will be provided at a cost of $500 per day or any part thereof in Western Hall. No charge will be assessed for Commencement, Bureau of Cultural Affairs productions, or other activities deemed appropriate by the administration.
Due to fire hazard and inefficient energy use, portable space heaters may not be used in University buildings. Additionally, these devices may not be purchased with University funds.
Acceptable alternatives include heated floor mats and radiating heating panels. Individual circumstances may warrant the consideration of other models. Requests for personal space warming devices must be approved by Physical Plant Mechanical Engineer.