Lake Ruth Dredging
Lake Ruth planned dredging during summer 2007 was delayed due to the need to divert financial resources to the emergency rental of chillers to provide air conditioning to Horrabin and Currens Halls. Dredging will be performed as soon as funding becomes available. In the interim, other options are being considered as temporary solutions to restore the aesthetic appeal of the northwest entry to the Macomb campus.
Contact Information
Bill Brewer
Assistant Director Physical Plant
Facilities Planning and Construction
Western Illinois University
1 University Circle
Macomb, Illinois 61455-1390
Phone: 309-298-1834, ext 272
Fax: 309-298-1695
WE-Brewer@wiu.edu
